Welcome To No. 1 Construction Solutions

visit our location:
10063 N. Navion Drive, Hayden, Idaho
Send us mail
[email protected]
visit our location:
10063 N. Navion Drive, Hayden, Idaho
Send us mail
[email protected]
Phone Number
(208) 772-9646
Get in touch

Projects

Portfolio

Reference Projects

Hayden Lake Sewer District – Services Contract

Big Sky has an on-going contract to complete service work for the Hayden Lake Sewer District. Through this contract we have jet almost 100,000 lf of sewer line in the last two years, cleaned most of their lift stations, complete numerous valve repairs and manhole rehabs. Owner: Hayden Lake Sewer District, Dustin Jacobsen, 208-660-7644, [email protected]. Contract Amount: $100,000.

Camp Bay Subdivision, Sagle, Idaho - Completed Summer 2023

Construction of civil infrastructure for a new luxury subdivision on Lake Pend Oreille. Includes sewer main and services, sewer treatment system (LSAS), extensive storm water controls and SWPPP management, excavation, subgrade and roadways. Owner: m3 Companies, Alex Brownlee, 623.980.9440, [email protected]. Contract Amount: $5,208,789.44

Hayden Canyon Subdivision – Completed Summer 2023

Construction of civil infrastructure for this new subdivision in Hayden, Idaho. Project includes over 5000 lf of 8 – 18-inch sewer piper, 24 manholes, sewer services, over 2500 feet of storm sewer from 12-24 Inch, 24 catch basins, 18 storm manholes, 41 drywells, swale ponds, culverts, 2000 lf of 16-inch water main, services, tie-ins, 10 fire hydrants, extensive excavation including over 28,000 SY of subgrade. Contact: Thomas Tedder, SUF Holdings, 208.618.1492, [email protected]. Contract Amount: $4,809,284.95

SubAgency Housing, Plummer, Idaho – Completed Spring of 2023

Construction of the infrastructure for a small subdivision for the Coeur d’Alene Tribe. Work included water and sewer main and service installation, stormwater controls, a new sewage lift station, road construction, and landscaping. Engineer: CDA Tribe, Dan Willms, Project Manager, 208.686-2001, [email protected]. Contract Amount: $2,092,458.70

Carlin Bay Water Treatment Plant, Transmission Main and Raw Water Intake, Coeur d’Alene, Idaho – Completed Spring of 2023

Construction of a new raw water intake in Lake Coeur d’Alene, new transmission main feeding the new Water Treatment Plant also being constructed by Big Sky including chlorine contact, sand filtration, and all associated interior piping, pumps, and Building. Engineer: Welch Comer Engineers, Steve Cordes, PE, 208.664.9382, [email protected]. Contract Amount: $1,466,975.85

Page WWTP Outfall Relocation, Smelterville, ID – Completed Winter 2022

Project involved extending the existing Page Wastewater Treatment Plant outfall pipeline approximately 1,300 linear feet and constructing a new discharge in the South Fork of the Coeur d’Alene River to discharge effluent directly into the River. There was  extensive work in the river including sheet pile installation, cofferdam construction, dewatering, and excavation. Owner: South Fork CDA River Sewer District, Pete Stayton, PE, 208.753.8041, [email protected]. Contract Amount: $2,092,458.70

Rosalia Sewer Improvements, Town of Rosalia, WA - Completed Spring of 2021

Construction and replacement of over 5,000 feet of gravity sanitary sewer pipe, 24 manholes, reinstating sanitary service connections, over 2,000 feet of water main, stormwater improvements including culverts, paved roadway reconstruction, utility relocations, and other related work. Owner: Town of Rosalia, Mayor Lee Root, 509.523.5991, [email protected]. Contract Amount $1,731,293.55

Troy Transmission Main – Completed Fall of 2021

Construction of approximately 11,000 lineal feet of 6-inch HDPE water main, a pressure reducing vault, valves, and connection to existing facilities. Owner: City of Troy, Idaho, Mayor Steve Corr, 208.835.2741, [email protected]. Contract Amount: $725,688.28

Showcasing Progress

Our Recent Projects

Schweitzer Mountain
Schweitzer Mountain
Lincoln South of Public Sewer
City of Moscow
Guardrail/Retaining Wall Improvements
Lakes Highway District
Gozzer Water Treatment Plant Improvements
North Kootenai Water & Sewer Dist.
Lilly Street Reconstruction
City of Moscow
Bennett Street Reconstruction
City of Athol
NW Passage Watermain Relocation
Resort Water Company
Wardson and Buttercup Waterline
Spokane County Water District #3
Northwest Passage Bridge
Independent Highway District
KCWD#1 Ph 1 Water Improvements
Kootenai County Water District #1
Crystal View Subdivision
Schweitzer Mountain Properties
The Union Revisions
ActiveWest Builders
KEC Cape Horn Utility Relocate
Kootenai Electric Cooperative
I90 Loop Replacement
City of Coeur d’Alene
Carlin Bay Waterlines
Carlin Bay Property Owners Assn
Camp Bay Ph 3 and LSAS System
M3 Companies
Panhandle Village Water System
Panhandle Village
Clarkview Reservoir Interior Coating
NKWSD
Hagadone Jet Port Vault Coating
Hagadone
Bentley Lift Station and Valve Vault Coating
City of Post Falls
Page WWTP Outfall Relocation
South Fork Sewer District
SubAgency Housing
CDA Tribe
Hayden Canyon Subdivision
SUF Holdings
Ferris/Wix Road
Ferris Lane Holdings