Big Sky has an on-going contract to complete service work for the Hayden Lake Sewer District. Through this contract we have jet almost 100,000 lf of sewer line in the last two years, cleaned most of their lift stations, complete numerous valve repairs and manhole rehabs. Owner: Hayden Lake Sewer District, Dustin Jacobsen, 208-660-7644, [email protected]. Contract Amount: $100,000.
Construction of civil infrastructure for a new luxury subdivision on Lake Pend Oreille. Includes sewer main and services, sewer treatment system (LSAS), extensive storm water controls and SWPPP management, excavation, subgrade and roadways. Owner: m3 Companies, Alex Brownlee, 623.980.9440, [email protected]. Contract Amount: $5,208,789.44
Construction of civil infrastructure for this new subdivision in Hayden, Idaho. Project includes over 5000 lf of 8 – 18-inch sewer piper, 24 manholes, sewer services, over 2500 feet of storm sewer from 12-24 Inch, 24 catch basins, 18 storm manholes, 41 drywells, swale ponds, culverts, 2000 lf of 16-inch water main, services, tie-ins, 10 fire hydrants, extensive excavation including over 28,000 SY of subgrade. Contact: Thomas Tedder, SUF Holdings, 208.618.1492, [email protected]. Contract Amount: $4,809,284.95
Construction of the infrastructure for a small subdivision for the Coeur d’Alene Tribe. Work included water and sewer main and service installation, stormwater controls, a new sewage lift station, road construction, and landscaping. Engineer: CDA Tribe, Dan Willms, Project Manager, 208.686-2001, [email protected]. Contract Amount: $2,092,458.70
Construction of a new raw water intake in Lake Coeur d’Alene, new transmission main feeding the new Water Treatment Plant also being constructed by Big Sky including chlorine contact, sand filtration, and all associated interior piping, pumps, and Building. Engineer: Welch Comer Engineers, Steve Cordes, PE, 208.664.9382, [email protected]. Contract Amount: $1,466,975.85
Project involved extending the existing Page Wastewater Treatment Plant outfall pipeline approximately 1,300 linear feet and constructing a new discharge in the South Fork of the Coeur d’Alene River to discharge effluent directly into the River. There was extensive work in the river including sheet pile installation, cofferdam construction, dewatering, and excavation. Owner: South Fork CDA River Sewer District, Pete Stayton, PE, 208.753.8041, [email protected]. Contract Amount: $2,092,458.70
Construction and replacement of over 5,000 feet of gravity sanitary sewer pipe, 24 manholes, reinstating sanitary service connections, over 2,000 feet of water main, stormwater improvements including culverts, paved roadway reconstruction, utility relocations, and other related work. Owner: Town of Rosalia, Mayor Lee Root, 509.523.5991, [email protected]. Contract Amount $1,731,293.55
Construction of approximately 11,000 lineal feet of 6-inch HDPE water main, a pressure reducing vault, valves, and connection to existing facilities. Owner: City of Troy, Idaho, Mayor Steve Corr, 208.835.2741, [email protected]. Contract Amount: $725,688.28